A basement is one of the best ways to get more space out of a landed plot in Singapore. It can hold a car porch, a gym, a home cinema or simply a lot of storage, without making the house look bigger from the street. But a basement is also the most technical part of a landed home to build. You are digging into the ground right next to your neighbours, often below the water table, and every rule from URA, BCA and PUB comes into play.
Here is a plain-English guide to the official rules we could verify, plus the practical points to plan for before you dig.
URA Rules: What Counts as a Basement?
URA’s handbook defines a basement storey as a storey that may be partly or wholly below the existing ground level. For storey height control, URA states that basement storeys that protrude more than 1.0m above ground level on any side are counted as a storey (URA basement guidelines). This matters because landed houses are limited to their 2-storey or 3-storey height control, so a basement that sticks out too far can cost you a storey above.
How Close to the Boundary Can a Basement Go?
URA’s envelope control guidelines for semi-detached houses, terrace houses and bungalows set out two types of basement:
- Basement with protrusion: up to the road buffer, and up to the building setback from other boundaries.
- Fully submerged basement: up to the road reserve line, provided the part under the green buffer is submerged at least 2m below ground level. It can go up to the site boundary, provided there are no technical requirements (such as sewerage or drainage), there is no adverse impact on the neighbouring property, and the basement wall along the boundary has no openings into the adjoining site. For semi-detached and terrace houses, the part under the 2m peripheral planting verge must also be submerged at least 2m.
For bungalows in Good Class Bungalow Areas, URA states that fully submerged basements must be set back 2m from the boundary lines.
Low-Lying and Sloping Sites
On low-lying sites, URA treats internal areas below PUB’s minimum platform level (MPL) as a basement storey that does not count as an extra storey, provided they are fully sealed with no external openings. If openings are proposed, URA lists PUB’s extra conditions: the internal finished floor must be at least 300mm above the adjacent road level, only areas like driveways, car porches, bin centres and turfed areas (or others PUB approves) may sit below the MPL, and bedrooms and M&E installations must be above the MPL. On sloping sites, URA may allow an exposed basement as long as it stays within the permissible building envelope height.
Does a Basement Count as GFA?
URA’s GFA handbook says all covered floor area is included as GFA unless exempted, whether or not it is usable. So a basement is generally counted. URA does state that basement diaphragm walls along the edge of the basement are excluded. For more on how floor area is counted, see our guide to GFA vs built-up area.
BCA Rules: Excavation, ERSS and Engineers
The walls that hold back the soil while you dig are called earth retaining or stabilising structures (ERSS). BCA’s Geotechnical Building Works submission requirements (March 2024, listed on BCA’s ST plan guidelines page) set out who must be involved, based on excavation depth:
- Up to 1.5m: plan approval not required (1m if the retaining structure is not reinforced concrete or steel).
- Over 1.5m to 4m: a QP (structural) is needed; no Accredited Checker.
- Over 4m to 6m: a QP (structural) plus an Accredited Checker.
- Over 6m, for basement excavation: classed as geotechnical building works, needing a QP (structural), a geotechnical engineer QP(Geo), an Accredited Checker and an AC(Geo).
For excavations deeper than 6m, the Accredited Checkers Regulations require the checker to review the site investigation, groundwater control, ground movement limits and the instrumentation and monitoring. Your engineer will confirm which category your basement falls in.
PUB Rules: Keeping Floodwater Out
PUB’s Code of Practice on Surface Water Drainage requires a crest level at every entrance, exit or opening to a basement. For basements of general developments, the crest must be at least 150mm above the minimum platform level. Flood protection must also be provided at all entry and exit points and openings, including windows, ventilation and services openings, at ground level. In practice, a ramp hump, steps or a flood barrier does this job. Your QP will confirm the MPL and crest level for your plot.
How a Basement Is Built
Soil Investigation and the Water Table
Every basement starts with a soil investigation. Boreholes tell the engineer what the ground is made of and where the groundwater sits, which shapes the whole design.
Holding Back the Soil
Common ERSS options include contiguous bored piles (a row of concrete piles side by side), secant piles (interlocking piles that also help keep water out) and steel sheet piles (steel sheets driven into the ground). Your engineer picks the system based on soil, depth, water and how close the neighbours are.
Dewatering and Monitoring
If groundwater is high, it has to be controlled during digging. Instruments around the site track ground movement, water levels and any tilt in neighbouring buildings, so problems are caught early.
Waterproofing
This is where basements succeed or fail. Good systems combine waterproof concrete, membranes or tanking, and careful detailing at joints. Fixing leaks after the basement is finished is hard and costly, so get it right the first time.
Ventilation, Light and Damp
Plan mechanical ventilation, dehumidifiers, and natural light through light wells or sunken courts where allowed. A sump pump with a backup helps clear any water that gets in.
Neighbours and Timing
Digging next to party walls needs care. A pre-construction survey of neighbouring houses records their condition before work starts, which protects everyone if a dispute arises. Basements are also far easier to plan during a house reconstruction than to add later, because foundations, structure, drainage and approvals are designed together. If you also want a pool, see our landed house swimming pool guide, and check whether any trees need NParks approval before digging.
Homeowner Checklist
- Decide what the basement is for: car porch, gym, cinema, storage or staff areas.
- Ask your QP to check URA setbacks, the 1.0m protrusion rule and GFA.
- Confirm your plot’s minimum platform level and basement crest level with PUB requirements.
- Commission a soil investigation early.
- Confirm the ERSS system and whether an Accredited Checker is needed.
- Arrange pre-construction surveys of neighbouring properties.
- Agree on the waterproofing system and warranty.
- Plan ventilation, lighting, dehumidification and sump pumps.
- Keep bedrooms and M&E above the MPL on low-lying sites.
Frequently Asked Questions
When does a basement count as a storey?
URA counts a basement as a storey if it protrudes more than 1.0m above ground level on any side.
Can my basement go right up to my boundary?
A fully submerged basement can, subject to URA’s conditions, including no openings into the neighbour’s site. In Good Class Bungalow Areas, it must be set back 2m.
Does a basement count as GFA?
Generally yes, as URA counts covered floor area unless exempted. Peripheral basement diaphragm walls are excluded.
Do I need an Accredited Checker?
Under BCA’s requirements, excavation deeper than 4m needs an Accredited Checker, and basement excavation deeper than 6m also needs geotechnical specialists.
Will a basement delay my TOP?
It adds stages to the build, and all works must be completed before final inspections. See our guide on TOP vs CSC.
Planning a Basement for Your Landed Home?
Three E Building Construction Pte Ltd (3E Build) can help you plan a basement that suits your plot, your soil and your family. Email enquiry@3ebuild.com or call +65 8885 8815. Builder with Integrity.